![](https://www.adox.de/Photo/wp-content/uploads/2018/12/DSCF1846.jpg)
06 Dec 2018 Around the back
In the last weeks we have been building around the backside of the new building. Parking spaces have been built, a rainwaterdraining basin and further waste water piping. Inside of the building we have moved tons of machines and materials, and installed electrical, pressurized air, photowater and water piping.