Author: Mirko Böddecker

Today the concrete floor has been poured and polished. Now it needs to dry for about 4 weeks. After this the works can continue. [caption id="attachment_6565" align="aligncenter" width="4032"] Polishing[/caption] [caption id="attachment_6564" align="aligncenter" width="4032"] Two days later we cerafully walked on the floor and slit it so it breaks evenly during drydown.[/caption]...

The new ADOSTOP is here. We applied the following changes: 100% citric acid as an active ingredient (no acetic acid part) Dismissal of the Biozide Water soluble indicator without solvent Advantages of the new recipe: Almost completely odourless when mixed Biodegradable / Non toxic No falling out of the indicator ADOSTOP ECO is the first product entirely...

We were lucky with the weather and building the factory went uninterrupted. The roof has been covered and the windows arrived. The doors are still missing and then we can poor the concrete for the floor.   [caption id="attachment_6435" align="aligncenter" width="3024"] On top of the coating tower "the coater" resides. The white pipes are the floor heating.[/caption] ...

The erecting of the coating tower has started. It is placed on a separate foundation which is separated from the environment via non-interacting separators. On top of it the coating table will be placed which is again decoupled from the tower so that the coater feels comfortable and cosy. Below: View from the machine axis. In...

The new ADOX creative gelatin filter series has been started with the revival of the famous type 85B tungsten-conversion filter. The new filter series features not less than three innovations [vc_separator type='normal' position='center' color='' thickness='' up='' down=''] The patented *SNAP-ON*-design allows a direct "screw-in" of the geltine filter into the cameras filter thread. You do not need...