Author: Mirko Böddecker

We were lucky with the weather and building the factory went uninterrupted. The roof has been covered and the windows arrived. The doors are still missing and then we can poor the concrete for the floor.   [caption id="attachment_6435" align="aligncenter" width="3024"] On top of the coating tower "the coater" resides. The white pipes are the floor heating.[/caption] ...

The erecting of the coating tower has started. It is placed on a separate foundation which is separated from the environment via non-interacting separators. On top of it the coating table will be placed which is again decoupled from the tower so that the coater feels comfortable and cosy. Below: View from the machine axis. In...

The new ADOX creative gelatin filter series has been started with the revival of the famous type 85B tungsten-conversion filter. The new filter series features not less than three innovations [vc_separator type='normal' position='center' color='' thickness='' up='' down=''] The patented *SNAP-ON*-design allows a direct "screw-in" of the geltine filter into the cameras filter thread. You do not need...

Today the roofing ceremony took place. The chief of cunstruction read out loud the roofing ceremony paragraph (adapted to steel constructions) and afterwards our boss had to tighten (a just for him re-loosened:-) nut. The long iron bar has a toque wrench set to 800kN. Boss is 6'3" but as thin as an aspargus. He...