Roof, Doors and Windows

Roof, Doors and Windows

We were lucky with the weather and building the factory went uninterrupted. The roof has been covered and the windows arrived.

The doors are still missing and then we can poor the concrete for the floor.

 

On top of the coating tower “the coater” resides. The white pipes are the floor heating.