Concrete floor has been poured

Concrete floor has been poured

Today the concrete floor has been poured and polished. Now it needs to dry for about 4 weeks. After this the works can continue.

Polishing

Two days later we cerafully walked on the floor and slit it so it breaks evenly during drydown.